Construction & Trades
virtual assistants
Virtual assistants for builders and trades — estimating, scheduling, invoicing and admin — from $14/hr + GST.
Virtual assistants for construction and trades
Builders and trades win on the tools, not the paperwork. A dedicated VA handles estimating support, scheduling, invoicing and back-office admin so you quote more and chase less.
Every placement is recruited, hired and managed by us and backed by our zero-risk promise: no placement fee, money-back first week, free replacement.
The work that comes off your desk
On a builder's desk the admin is the job: a quote that misses a trade, an RFI nobody answered, a progress claim served late. Estimators and site managers end up doing take-offs after hours and chasing insurance certificates on Sunday. Almost none of that needs to happen on site or in Australia.
Loads the architectural set into Buildxact or Procore, sets the scale, and measures slab and wall areas, linear metres of framing, opening schedules and finishes counts into a quantity list, then flags drawing conflicts for the estimator rather than assuming.
Packages the plans, scope and inclusions to each trade, tracks who has responded, and builds the comparison sheet that lines quotes up against the scope so the estimator can see what a cheap price has left out.
Drops the take-off quantities into cost centres, applies current supplier pricing and the agreed labour rates, adds provisional and prime cost sums, and produces the client-facing quote and inclusions schedule for the licensed builder to price and sign.
Moves task dates in the Buildxact or Procore schedule after the site meeting, reworks the downstream trades, sends the revised call-up dates to each subcontractor, and lists the slipped items and their causes for the site manager's weekly report.
Raises RFIs in Procore from the site manager's question, attaches the marked-up drawing extract, chases the architect or engineer against the response due date, then distributes the answer and updates the drawing register when a revised sheet lands.
Builds the variation from the RFI or client instruction, prices it off the estimate and the trade's quote, drafts the variation notice with the time and cost effect for the builder to check, issues it for signature, and keeps the variation register current.
Works out the claim against the contract payment schedule and the stage actually reached, attaches approved variations and supporting evidence, prepares it as a payment claim under the security of payment legislation applying in that state — the Building Industry Fairness (Security of Payment) Act 2017 in Queensland — and diarises the payment schedule and payment due dates.
Checks each incoming subcontractor claim against the order, the work in place and retention held, drafts the payment schedule and the supporting reasons for any amount the contract administrator decides to withhold so it can be issued inside the statutory response window, and flags claims for unapproved variations.
Checks each trade's licence against the QBCC, Building Commission NSW or Building and Plumbing Commission (Vic) register, collects certificates of currency for public liability and workers compensation, holds the signed subcontract and subcontractor statement, and tells the site manager when anything on the list has expired.
Requests the SWMS from each subcontractor before high risk construction work starts, checks it names the activities on that job and is current, files it to the site register, and lists what is still outstanding for the principal contractor to obtain and review before work begins.
Raises purchase orders in simPRO, AroFlo or Buildxact against the job cost centre, matches supplier invoices to orders and delivery dockets, queries price and quantity differences with the supplier, and codes the approved invoice through to Xero or MYOB.
Books jobs and technicians in simPRO or AroFlo with the right site, cost centre and status, chases timesheets and job notes off the mobile app, and pulls back the test sheets and compliance certificates the invoice needs before it goes out.
Prepares the statutory insurance applications each job needs — QBCC home warranty in Queensland, an icare HBCF certificate in New South Wales, Home Warranty cover issued by the Building and Plumbing Commission in Victoria, or domestic building insurance for Victorian contracts signed before 1 July 2026 — and files the certificate to the job before any money is taken or work starts.
Collects warranties, operation and maintenance manuals, as-built drawings and the trade compliance certificates — electrical, plumbing, waterproofing, termite — into the handover pack, then logs the defect list from the walkthrough and chases each trade to close its items out.
What stays with you
We are a staffing company, so this list argues against our own interest. It is also the part that matters: the work below is reserved, and no amount of supervision moves it. Get the line written down before anyone starts in a building business.
- Contracting for building workEntering into a contract to carry out building work above the state threshold requires a licence held by the builder. Your coordinator prepares the quote and the contract documents; the licensed builder prices, signs and carries the work.QBCC (Qld), Building Commission NSW, Building and Plumbing Commission (Vic) and state equivalents
- Building advice and buildabilityAdvice on method, sequence, structural adequacy or whether a detail can be built is licensed builder or engineer territory. A take-off is a measurement, not an opinion on the drawing it came from.State building licensing — QBCC (Qld), Building Commission NSW, Building and Plumbing Commission (Vic)
- Preparing and obtaining SWMSA SWMS is prepared by the business carrying out the high risk construction work, in consultation with the workers doing it, and the principal contractor must obtain a copy before that work starts. In Victoria the same duty sits with the employer or self-employed person under the OHS Regulations, which do not use the term PCBU at all. Offshore staff request, chase and file them; they do not write them and there is no offshore sign-off.Model WHS Regulations (SafeWork NSW, WorkSafe Qld and the other harmonised states); Occupational Health and Safety Regulations 2017 (Vic) — WorkSafe Victoria
- Safety decisions on siteStopping work, deciding a control measure is adequate, running a toolbox talk, inducting a worker or deciding a task is safe to proceed are duties of the business carrying out the work and its supervisors — the PCBU in the harmonised states, the employer or self-employed person under Victoria's OHS Act — on the ground, in Australia.Work Health and Safety Act in the harmonised states; Occupational Health and Safety Act 2004 (Vic); state WHS and OHS regulators
- Certification and compliance sign-offBuilding surveyors and certifiers issue the inspection, occupancy and final certificates; the licensed electrician or plumber signs the compliance certificate for the work they did, to Energy Safe Victoria for Victorian electrical work and to the Building and Plumbing Commission for Victorian plumbing. Your coordinator collects and files those documents and never signs one.State building certifier registration and licensed trade certificate schemes
- Serving and responding to payment claimsThe payment claim and the payment schedule are statutory documents with hard deadlines and real consequences for getting them wrong, and if a claim goes to adjudication it is decided by a registered adjudicator appointed through an authorised nominating authority — never in-house. Preparation offshore is fine; the decision on what to claim, withhold or dispute stays with the contract administrator.Security of payment legislation in each state, e.g. Building Industry Fairness (Security of Payment) Act 2017 (Qld)
Roles for Construction & Trades
Specialist roles for builders and trades
Five dedicated roles covering estimating through to progress claims and dispatch.
Estimating assistant
Take-offs, supplier pricing and quote assembly.
Explore →Project coordinator
Programme, RFIs, variations and site documentation.
Explore →Compliance & HSE admin
Inductions, insurances, licences and registers current.
Explore →Progress claims & invoicing
Claims on time, retentions tracked, variations invoiced.
Explore →Scheduling & dispatch
Board kept full, crews dispatched, customers confirmed.
Explore →